Book by 3:00 PM → your dumpster drops tomorrow, 7 AM–5 PM · (281) 673-4344
Baytown Dumpster RentalOur own trucks. Your exact bill. Talk to the crew with the trucks(281) 673-4344Call now

Remodeling Dumpster Rental by Room

A bathroom remodel usually starts with a 10-yard dumpster, and a kitchen gut usually starts with a 15- or 20-yard. Tile, mortar and plaster are heavy, so weight matters as much as space. Every rental includes 7 days and 2 to 6 tons, with extra weight at $75 per ton by the exact pound.

20-yard roll-off dumpster on a concrete driveway
  • CostOne flat rate covers delivery, pickup, 7 days and 2–6 tons by size. Over that: $75/ton, by the pound.
  • DeliveryBook by 3 PM, it drops tomorrow 7 AM–5 PM. Baytown and up to 80 miles out.
  • SizeCleanouts: 10 or 15. Roofs and remodels: 20. Big builds: 30 or 40. Size picker
  • PlacementOn your driveway, on wood boards. Street spots usually need city approval.
  • Can't go inChemicals, wet paint, batteries. Tires, mattresses, freon appliances: $50 each. Full list
Exact price in one callCall now(281) 673-4344

What size dumpster do I need for a kitchen or bath remodel?

A 10-yard dumpster is the usual start for one bathroom, and a 15- or 20-yard is the usual start for a kitchen. Flooring and drywall jobs depend on square feet and material. Use the table below as a typical starting point, then size up if you're gutting more than one room.

Room or jobTypical size to start withIncluded tonsWeight watch
One bathroom gut10-yard2Tile, mortar bed and a cast-iron tub are heavy
Two bathrooms15-yard2.5Same heavy items, twice
Kitchen gut (cabinets, counters, drywall)15- or 20-yard2.5 or 3Stone counters and tile backsplash
Flooring tear-out (carpet, vinyl, laminate)10- or 15-yard2 or 2.5Carpet pad is bulky; wet carpet is heavy
Tile floor tear-out10- or 15-yard2 or 2.5Tile and thinset add weight fast
Drywall or plaster removal, several rooms15- or 20-yard2.5 or 3Plaster and lath weigh more than drywall
Whole-house remodel20- or 30-yard3 or 4Plan a swap if heavy debris piles up

Sizes are labeled typical, not promises. See the 10-yard dumpster and 15-yard dumpster pages for specs.

Have a question about your job? Get the size, included tons and flat rate in one call.

Call now (281) 673-4344

Will tile and plaster put my remodel dumpster over weight?

Tile, mortar, plaster and stone counters can reach the included tons before a remodel dumpster looks full. A 10-yard includes 2 tons, a 15-yard 2.5 tons and a 20-yard 3 tons. Anything over is $75 per ton, billed pro-rata by the exact pound from the landfill's scale ticket.

Example: a 15-yard includes 2.5 tons. If the scale ticket shows 2.9 tons net, you pay for 0.4 tons, which is $30. The ticket copy comes with your final invoice, emailed 3–5 business days after pickup. More in how dumpster weight is billed.

How should I load a remodel dumpster?

Load heavy remodel debris like tile and plaster low and spread it evenly, then put bulky cabinets and drywall on top. Break down cabinets and vanities so they lie flat. Keep everything level with the top rim, because an overfilled dumpster can't legally be hauled and the $125 dry-run fee applies.

Fill gaps with small debris to use the space you're paying for. Tips are in how to load a dumpster.

Where does the dumpster go during an interior remodel?

The remodel dumpster usually goes in the driveway, close to the door your crew will carry debris through. The truck typically needs about 60 feet of straight approach and about 23 feet of overhead clearance. Wooden boards go under the rails to protect concrete and asphalt driveways.

Leave a clear path from the door to the bin and park cars out of the way before delivery. Book by 3:00 PM for next-day delivery between 7:00 AM and 5:00 PM. Driveway questions are covered in dumpster placement on a driveway.

Do lead paint and asbestos rules apply to my remodel?

The EPA lead RRP rule, 40 CFR 745 Subpart E, requires lead-safe work practices from paid renovators working in pre-1978 homes. The EPA asbestos NESHAP rule, 40 CFR 61.145, covers inspection and notice for certain demolition and renovation projects. Older flooring, ceiling texture and pipe wrap are worth testing first.

The law: paid renovators in pre-1978 housing follow RRP; covered projects follow NESHAP. Our advice: test suspect material before tear-out and call before loading anything that may contain asbestos. Confirm with your permit office, HOA or landfill.

What remodel items can't go in the dumpster?

Hazardous chemicals, wet paint and batteries can't go in a remodel dumpster. A refrigerator, freezer or window AC with freon costs $50 extra per item, and so does a mattress. EPA rule 40 CFR 82.155 requires refrigerant recovery before final disposal of those appliances.

Dry, empty paint cans are different from wet paint; let leftover latex dry out before it goes in. Household hazardous waste options are on the TCEQ household hazardous waste page.

Common questions

How long can I keep the dumpster while my contractor works?
Each rental includes 7 days. Extra days are $25 per day, which can be cheaper than a swap if the bin isn't full yet.
Can I throw out the old cast-iron tub?
A cast-iron tub can go in, but it is one of the heaviest single items in a bathroom. Lay it flat on the floor of the bin and count it toward your included tons.
My kitchen remodel will take a month. What are my options?
Keep the bin for 7 days plus $25 per extra day, or swap it when full. A swap is a new standard rental with its own included tons.
Can the bin sit in my driveway if my contractor parks there too?
The dumpster takes a full lane of driveway. Plan where trucks will park before delivery so the drop spot stays clear.
Call now(281) 673-4344Get a quote